MULTAN, (Muzaffargarh.City – 23rd Dec, 2018 ) ::Multan Electric Power Company (Mepco) has installed 1,232 kilometres long high-tension (HT) lines across the region during the current fiscal year so far.
According to Mepco official sources, the high tension and low tension (LT) lines were being installed across the region to ensure electricity supply with best voltage, early provision of new connections and system upgradation.
During July to November 2018, Mepco has installed 1232 kilometre high tension lines across region and total length of HT lines reached to 75000 kilometre. The Mepco has also installed 846-kilometre low tension lines and total length of LT lines reached 49,406 kilometres.
The sources said that 86-km HT and 14-km LT lines installed in Multan circle, 146-km HT and 28-km LT lines installed in DG Khan circle, 167-km HT and two-km LT lines in Vehari circle, 214-km HT and 23-km LT lines in Bahawalpur circle, 277-km HT and seven-km LT line in Sahiwal circle, 60-km HT and six-km LT lines in Rahim Yar Khan circle, 59-km HT line in Muzaffargarh circle, 111-km HT and 19-km LT lines in Bahawalnager circle while 108 kilometre High Tension lines installed in Khanewal circle during July to November.
ISLAMABAD, Feb 10 (APP): Independent Candidate, Rana Abdul Manan Sajid has won the Punjab Assembly…
ISLAMABAD, Feb 9 (APP): Pakistan Muslim League Nawaz Candidate Amir Talal Khan has won the…
The Pakistan Tehreek-e-Insaf (PTI) backed independent candidate Jamshed Dasti secured the seat of Muzaffargarh’s National…
مظفرگڑھ (مظفرگڑھ ڈاٹ سٹی ۔ 05 ستمبر2023ء) سڑک کنارے ایک نامعلوم شخص کی لاش ملی…
مظفرگڑھ (مظفرگڑھ ڈاٹ سٹی ۔ 04 ستمبر2023ء) مظفرگڑھ میں نامعلوم موٹرسائیکل سوار نے فائرنگ کر…
مظفرگڑہ (مظفرگڑھ ڈاٹ سٹی۔ 02 ستمبر2023ء) پٹرولنگ پولیس مظفر گڑہ کی قانون شکن افراد کے…